Tuesday, May 18, 2010

Shan’Xi thermoplastic PPO Plant

2005 – 2006, capital project, blog wedding dresses 2010polymerization reactor batch instrumented control system blog wedding dresses 2010administrator and coordinator, MOC cycle life, control system staging, loop-test and function-test, sequenced control schemes develop and change, Interlock & SFC & polo shirts polo shirts shopshopPLM & Recipe test and management, align control system with process intention, control loop tuning and control system training for operator, and trouble-shooting activities;2006, capital project, plant commissioning and chemicals introduction, fcheap jeans shopcheap jeans shoplow-check and punch-list, piping re-arrangement and improvement, operational readiness inspection (ORI) items close out, process alarm & trip table update per water testing, tank/vessel level calibration, critical equipments water trials implement, plant water batching, initial operation shift support and etc.
2005 – 2006, capital project, critical rotating equipment support, support rotating equipment installation and commissioning and operation, such as steam-jacket dryer and continuous rotary drum filter, equipment manual translation for Chinese distribution; 2009, plant engineering – heat exchanger stall elimination (avoid water hammer), Coordinator and proposal driver, trouble-shooting and decision-making, P&ID, , MOC cycle life, equipment quotation support, steam trap sizing and selection, specification and documentation, piping drawing and flow check, ORI close out, SOP/commissioning/operation, etc. 2009 - 2010, plant engineering - new products introductions (NPI), plant coordinator, P&ID, HAZOP, , new equipment specification, new interlocks for NPI, MOC cycle life, equipment quotation support, ORI close out, SOP/commissioning and operation and etc.Almost 6-year experience on implementing of capital projects and plant engineering project in the process role;? 1.5-year experience on pressure-relieving engineering practice in rounded cycle life based on relief design scenario study;? 2-year experience on developing Excel engineering calculation to support process calculation activities;Career Objective:
http://forum.homefarmer.co.uk
http://www.nucleosys.com/forum
http://health-food-forum.com
http://urbanity.es/foro
http://www.fousdanim.org/forum

No comments:

Post a Comment